Enhancing Reliability: Tega's Solution for Reduced Shutdowns in SAG Mill Trommel in Minera Excondida (chile)
Industry:
Copper Ore Mining
Application:
SAG Mill
Trommel Size:
Ø5320 X 4522 mm
Feed (in TPH):
6500 TPH
% Solid:
70 %
Sp. Gravity of Solids:
2.2
Customer’s Concerns:
The existing panels had operational life of 4 months which required 3 shutdowns annually.
Here the challenge was to increase the life of panels to 6 months along with prevention of higher wear in 2nd row of panels to minimize the number of shutdowns.