Centrax Conveyor Component Case Study: Productivity Improvement

Application Area: Line C-45 of the steel plant Customer Concern: The belt conveyor handled materials like coal, coke, sinter, pellets & lime which led to varying discharge parabola and to misalignment in the receiving belt. Misalignment of rollers were also responsible for mistracking o...

Read more
Jumbo Conveyor Component Case Study: Productivity Improvement

Application: 1600 mm Belt Width conveyor at Coal Handling Plant Customer Concern: 400mm lumps from run of mines application inflicting severe damage to the conveyor belts. Frequent loosening of the fixing bolt & damage to the impact frame. Solution Implemented Traditional impact be...

Read more
Hosch - Total Solution in Power Plants Case Study: Productivity Improvement

Application: 1550 MW Power Plant in North India Customer Concern: Conveyor 2B, 1200mm BW, plays a vital role in conveying material from wagon tippler to main plant. The conveyor had excessive spillage at the loading station, frequent damage of impact idlers & return idlers and belt dama...

Read more
Scrapers in Reversible Conveyors: Restoring Reliability in a Critical Coke Transfer Line

Overview A high-capacity reversible conveyor on a coke transfer line was experiencing recurring carryback and spillage, forcing frequent cleanups, unplanned downtime, and safety risks. Multiple legacy scrapers had been tried without success. Hosch deployed a next-generation Scraper System engineer...

Read more
Tega Jumbo Bed: Eliminating Impact Idler Failures and Spillage in Tunnel Conveyors

At a Major Port Operator in Eastern India Case Introduction: A leading bulk cargo port on India's eastern coast handles coal, iron ore fines and slag through a network of underground tunnel conveyors. Among these, BCL-1A and BCL-1B operate under severe impact loading, with material falling from heig...

Read more