Material blockage and obstructions in the flow of material for dry applications
Providing the perfect solution: The Thunder Air Blaster provides an excellent solution when it comes to breaking the adhesive and cohesive forces of materials stored in the material handling equipments, thereby restoring free flow of materials. A quantity of compressed air at 6-8 Bars is released in a few milliseconds as a blast in strategic locations of the equipment.
Tega Thunder Air Blaster also provides the maximum thrust for the available sizes of any other air cannon. It operates through a unique diaphragm technology, making it maintenance free and a lifelong investment. The thrust delivered by this product is not only powerful but 45% more effective than any other air cannon of comparable size.
By firing the air blasters in an adjustable sequence by means of an electronic control box, blockages can be avoided and the full capacity of the equipment is utilized. As the quantity of air is very small in proportion to the volume of the storage equipment, the energy of the blast is dissipated and absorbed by the material. There is no damage whatsoever to the structure.
Sed quia non numquam eius modi tempora incidunt ut labore.
Sed quia non numquam eius modi tempora incidunt ut labore.
Sed quia non numquam eius modi tempora incidunt ut labore.
Sed quia non numquam eius modi tempora incidunt ut labore.
Tega DynaPrime range has been designed specifically for the bigger size of the mills where modern liner handlers are available. Tega DynaPrime has been engineered to reduce the number of pieces being installed inside the mill, substantially reducing the installation downtime for maximum mill operation up-time.
Tega DynaPrime puts safety above all and has taken measures to render the reline site safe. Bolting from outside and lesser weight of the lining considerably reduces any risk during the installation of the liner.
Tega DynaPrime range has been designed specifically for the bigger size of the mills where modern liner handlers are available. Tega DynaPrime has been engineered to reduce the number of pieces being installed inside the mill, substantially reducing the installation downtime for maximum mill operation up-time.
Tega DynaPrime puts safety above all and has taken measures to render the reline site safe. Bolting from outside and lesser weight of the lining considerably reduces any risk during the installation of the liner.
Tega DynaPrime range has been designed specifically for the bigger size of the mills where modern liner handlers are available. Tega DynaPrime has been engineered to reduce the number of pieces being installed inside the mill, substantially reducing the installation downtime for maximum mill operation up-time.
Tega DynaPrime puts safety above all and has taken measures to render the reline site safe. Bolting from outside and lesser weight of the lining considerably reduces any risk during the installation of the liner.