Enquire Now
×

Enquire Now

Dynaprime

Tega DynaPrime®: Sustaining Consistent Excellence for 6 Months - Case Study

Achieved 6-month lifespan at 30% total charge volume and 9.9 rpm speed.

Read more
Tega DynaPrime®: A Steadfast 6-Month Journey of Excellence - Case Study

Achieved 6-month lifespan at 530 tph throughput and 11.3 rpm speed

Read more
Consistent 8-month excellence with Tega DynaPrime® - Case Study

Achieved 8-month lifespan at 2,600 tph throughput and 9.7 rpm speed

Read more
Delivering Success: Tega DynaPrime® excels with 9-month Performance - Case Study

Achieved 9-month lifespan at 2,600 tph throughput, and 9.7 rpm mill speed

Read more
Tega DynaPrime® Sets the Bar with 6-Month Improved Performance - Case Study

Achieved 6-month lifespan at 28% total charge volume, and 22% ball charge volume

Read more
Tega DynaPrime® Consistency: 12 Months of Unwavering Excellence - Case Study

Achieved 12-month lifespan operating at 2,300 tph throughput and 9.2 rpm mill speed

Read more
Elevating Excellence: Tega DynaPrime® shines in Chile's 40ft SAG Mill - Case Study

Achieved 7-month lifespan at 3,750 tph throughput, 9.9 rpm speed

Read more
Tega DynaPrime® Success Story: Enhancing Chile's Giant-Sized Mills - Case Study

Achieved 6-month lifespan at an average throughput of 4,300 tph, mill speed of 9.3 rpm

Read more
Tega DynaPrime®: Setting new standards in Chile' SAG Mils - Case Study

Tega's liner achieved a lifespan of 6 months (R1 & R2)

Read more
Driving success: Tega DynaPrime® in Chilean SAG Mill Operations - Case Study

Achieved a lifespan of 6 months (R3) with an average throughput of 4,100 tph despite challenges

Read more
Tega DynaPrime® excelling in Chile's 40' SAG - Case Study

Tega's liner delivered 80% Increase in mill productivity.

Read more
Tega DynaPrime® reduces installation time and manpower by 25% - Case Study

Increased liner life by 50% with quicker and safer installation using 52% fewer pieces

Read more