The rotors and stators featured in this photo were designed and fabricated for a client’s flotation cell and were shipped and installed in Queensland, Australia
The rotors and stators featured in this photo were designed and fabricated for a client’s flotation cell and were shipped and installed in Queensland, Australia
The rotors and stators featured in this photo were designed and fabricated for a client’s flotation cell and were shipped and installed in Queensland, Australia
The final sections of a Spill-Ex conveyor solutions were dispatched to a client in the Pilbara, Western Australia, this week. The modular skirting assembly will be mounted on an iron ore conveyor system in the Pilbara region, northwest WA.
Tega Australia were honoured to support the fundraising event held by Fosterville in support of the Fosterville family of Grace who struggles with the medical condition Ataxia Telangiectasia.
Losugen, a Tega company, recently refurbished a trommel for a client in Northwest Western Australia. The trommel @ 3.6m x 4.33m arrived on time and safely at its destination in mid August 2022.
Case study that reviews the performance and operational savings achieved on the recent transition from traditional steel mill liners to DynaPrime. This case study features client findings and recommendation made.
Over a 2 year period from 2020 to 2022 a Tega client evaluated the performance of a DynaSteel, DynaPulp and DynaPrime mill liner solution in a Sag mill 28' x 13' (8.5m x 3.9m).