Enquire Now
×

Enquire Now

Home / Mill Liner Case Studies / Dynaprime / Continuous Efficient Maximized Grinding

Tega DynaPrime® Reduces Installation Time and Manpower by 25%

Industry:

Copper

Application:

Ball Mill

Diameter:

7.62 m X 11.89 m Long

Process Parameters

Tonnage: 1,800 TPH

F8O :(-)12mm

Mill Speed: 7 5% critical speed

Top Media Size: 76 mm

Objective:

Increase liner life with faster and safer installation

Delivered through DynaPrime ®:
  • 50% increase in life (from 12 months to 18 months)
  • 52% reduction in number of pieces installed
  • 35% reduction in total weight of the lining
  • 24% reduction in number of bolts
  • lnstallationtime of only 23 hours for full mill against 46 hours required with the steel liner
  • 5.2% reduction in specific power consumption
  • 25% reduction in installation man power

Tega DynaPrime® deliversepic performance in giant sized mills

Tega DynaPrime® Reduces Installation Time and Manpower by 25%